34 Tappan Street Manchester

By the Sea

Before and After

 

The Granary project at 34 Tappan St in Manchester-By-the-Sea is a unique and harmonious proposal to create 4 residential units of 2-3 bedrooms utilizing the existing buildings on the property.

This project enhances and improves the property in every possible way including:

  • Better residential use than current commercial/industrial use

  • Lower traffic impact

  • Commercial trucks removed

  • Employee vehicles removed

  • Improved traffic safety on Tappan St.

  • Much lower environmental impact

  • Dramatic aesthetic improvement

  • Fewer vehicles on-site

  • Noise reduction

  • Increased tax revenue

  • Increased flood control

  • Reduced water run-off

  • Better wetlands protection

  • Increased housing within walking distance to local businesses.

  • Increased neighboring property values

  • More availability and diversification of housing stock

Key Facts supporting The Granary Project

 

Environmental Benefits

  • Existing buildings repurposed in place, or ‘adaptive reuse’, is one of the best ways to conserve our natural resources.

  • Removing the paved parking lot and adding permeable surface areas, all decrease the environmental impact.

  • Adding green spaces, trees, vegetation, and reducing water run-off, increase groundwater recharge and reduce flooding.

  • Removing and remediating asbestos siding fully removes potentially harmful asbestos from the site.

  • Reducing exposed parking to garage spaces reduces salt, oil, anti-freeze and salts entering to the wetlands.

Key Facts supporting The Granary Project

 

Neighborhood Benefits

  • Removing the existing commercial/industrial use from the residential area is far more harmonious and consistent with the underlying residential use.

  • Removing vehicles visible on the property by using the existing garage to provide garage spaces for each unit.

  • No changes in structures reduces construction to a renovation only project.

  • Removing commercial trucks on the property reduces commercial traffic impact on Tappan Street.

  • Removing employee parking on the site reduces overall parking of vehicles dramatically

  • Closing down the apron and curb cut entering the property reduces speeds and increases safety on Tappan Street.

  • Adding landscaping, trees, vegetation, stone wall, and closing the curb cut enhances the impact of the view of the existing building.

  • Removing the commercial use reduces the noise and visual impact from trucks, employees, and dumpsters on the site.

  • Renovating the existing buildings increases the aesthetics of the site overall.

  • Landscaping and renovations of the site increases valuations of nearby homes.

Key Facts supporting The Granary Project

 

Town Benefits

  • Increased and diversified housing stock.

  • Increased drainage and run-off management.

  • Increased tax revenue.

  • Increased alignment with Manchester’s Master Plan objectives.

  • Increased housing stock closer to public transportation and the downtown.

  • Increased downsizing and ADA compliant housing options for seniors and mobility impaired who want to stay in Manchester.

  • Decrease in residential ‘off-site’, exposed, and ‘on-street’ parking.

  • Increased housing within walking distance to local businesses.

  • Removal of a commercial/industrial use in a residentially zoned neighborhood.

GIS Location of Property

Existing Site Plan

 

Proposed Site Plan

(No significant changes in building footprint or size)